Project category: Housing construction
Project location: Baoshan, Shanghai
Project time: June 2014
Project overview: Changes in the design of additional layers, increasing the cross-section of foundation columns; Increase the load, increase the section.
Engineering materials: carbon fiber fabric, carbon fiber impregnating adhesive, steel bonding adhesive, anchoring epoxy resin adhesive.
The hospital was founded in 1942 and renamed the Second Affiliated Hospital of Guilin Medical College in 2014.China Chest Pain Center certification unit,Guilin critically ill pregnant women treatment center and critically ill newborn treatment center.