Project Overview: Due to the impact of heavy vehicle load, the bridge cracks, bridge needs to carry out routine maintenance and reinforcement to repair the cracks.
Strengthen Method: crack seal and repair
Material Selection: crack injection structural adhesive ,crack seal structural adhesive
The Hamid Bridge is located in the deeply eroded canyon area, across the existing gully, with steep terrain and small local site, making construction difficult and safety risks extremely great. Before the pouring of pile foundation 6-2# on the right side of the Hamid Bridge, the project department prepared a special construction plan and invited experts to demonstrate, carried out detailed quality and safety technology, and implemented strict acceptance and procedures to ensure construction safety and pouring quality.